7 Bassein Road, Novena · District 11· Freehold
The Serra Residences logo
The Serra Residences residents’ dining room with lounge seating and garden views

A Supply Pipeline Read From Novena

Investors tend to start with the pipeline: which sites are coming, how many homes they carry, and when the process closes. The 13 August 2026 release from URA answers those three questions for two sites, and the facts are set out here next to the record for The Serra Residences.

The Pipeline Figures Behind The Serra Residences' Market Context

URA released Marina Gardens Lane and Orchard Boulevard for sale by public tender under the Confirmed List of the 2H2026 Government Land Sales (GLS) Programme. Marina Gardens Lane, near Marina South MRT station, carries about 390 homes; Orchard Boulevard, near Orchard Boulevard MRT station, carries about 110. The Confirmed List for the half-year totals about 4,745 homes, a figure that frames the scale of the programme without saying anything about any single project.

The Calendar an Investor Can Mark Beside The Serra Residences

Tenders close at 12 noon on Thursday 15 October 2026 (Marina Gardens Lane) and 12 noon on Thursday 29 October 2026 (Orchard Boulevard). Developers obtain the tender documents, called eDeveloper's Packets, through URA's One-Stop Developers' Portal. The VVIP preview of The Serra Residences runs from 2 to 13 October 2026, so its last day falls two days before the first tender closes.

Three dated layers sit on the page. The first is URA's tender calendar, which runs from 15 to 29 October. The second is the project's preview window, which closes on 13 October. The third is the construction timetable, from an estimated TOP in Q4 2030 to expected legal completion on 1 September 2034. Read in sequence, they show public-sector release dates and private project milestones running side by side, each on its own clock.

What The Serra Residences Itself Offers

The Serra Residences is a single 28-storey tower of 133 homes at 7 Bassein Road, Novena, in District 11, with Novena MRT about an 8-minute walk away. The tenure is freehold. There are 13 unit types, from Type B1 up to two penthouses, along with a 50 m lap pool and a Sky Terrace. The developer is Far East Organization, which issued project information on 18 September 2026; that information is the reference for the figures on the project-details page. The tower's compact count of 133 homes and its single-block form give Bassein Road a small, self-contained community.

Novena is an established district, and the walk of about eight minutes to Novena MRT keeps the address tied to the rail network. The tender sites named by URA are each described by their own stations, a reminder that rail access is the common reference point for every site in a programme of this kind.

Dates to Hold for The Serra Residences

Estimated TOP is Q4 2030, with expected vacant possession on 1 September 2031 and expected legal completion on 1 September 2034. The balance chart opens once sales commence, and further details will be published as the developer releases them. The location page sets out the Novena surroundings, the homepage gives the overview, and the Sales Concierge fields questions through this enquiry link.

General information only, not financial or legal advice.

Source: URA. This article is independent commentary; The Serra Residences is not affiliated with the parties mentioned.

Showflat Viewings

Register Your Interest in The Serra Residences

Now open for sale. Showflat viewings are arranged by appointment through the Sales Concierge. Book a showflat appointment.

The e-brochure, the full floor plan set and the current price list are sent to registered parties by the Sales Concierge. Registering is free and carries no obligation.

The Serra Residences lap pool with sun loungers and the poolside pavilion on level 3
The lap pool and poolside pavilion on level 3. Artist’s impression — indicative only.

Register Your Interest

Prefer to speak to someone? Call +65 6200 6220, or message the same number on WhatsApp.